Gaico continues to lead the way for infrastructural development to meet the demands of the Oil & Gas Industry.
Our Fabrication and Sandblasting department continues to weld these 700mm pipes to a length of 38m.
Today the Pile Driving & Marine department was able to successfully drive one 38m Steel Pile using a fleet of our pile driving equipment. Gaico now has the capability to drive any size and any length of piles on land or over water.
Safety is always our top priority and we continue to maximize local content in our workforce.
Date: 27th September, 2020